Máximos: 60 ton – manga 5 m / Maximum: 60Ton – Beam 5m. El precio incluye una maniobra de izada o botadura / The rate includes one launch /lift off /onto cradle / transport.
ESLORA / LENGTH (LOA) | PRECIO / RATE | IVA / VAT 21% | TOTAL – TOTALLY |
---|---|---|---|
HASTA 10 M. / UP TO 10 M. | 81,51 | 17,12 | 98,63 |
DE 10 A 12 M. / 10 TO 12 M. | 136,80 | 28,73 | 165,53 |
DE 12 A 14 M. / 12 TO 14 M. | 157,85 | 33,15 | 191,00 |
DE 14 A 16 M. / 14 TO 16 M. | 210,46 | 44,20 | 254,66 |
DE 16 A 18 M. / 16 TO 18 M. | 254,62 | 53,47 | 308,09 |
DE 18 A 20 M. / 18 TO 20 M. | 308,28 | 64,74 | 373,02 |
DE > 20 / > 20 M. | 342,62 | 71,95 | 414,57 |
MAQUINA A PRESIÓN / HIGH-PRESSURE CLEANER | PRECIO / RATE | IVA / VAT 21% | TOTAL – TOTALLY |
---|---|---|---|
HASTA 12 M. / UP TO 12 M. | 61,11 | 12,83 | 73,94 |
DE 12 A 16 M. / 12 TO 16 M. | 71,29 | 14,97 | 86,26 |
DE > 16 M. / > 16 M. | 91,68 | 19,25 | 110,93 |
PLUMA / BOOM | PRECIO / RATE | IVA / VAT 21% | TOTAL – TOTALLY |
---|---|---|---|
1ª HORA / 1ST HOUR | 54,05 | 11,35 | 65,40 |
2ª HORA Y SIGUIENTES / 2ND AND NEXT | 27,02 | 5,67 | 32,69 |
Mínimo facturado : una hora.
Minimum invoiced: one hour.
OTROS SERVICIOS / OTHER SERVICES | PRECIO / RATE | IVA / VAT 21% | TOTAL – TOTALLY |
---|---|---|---|
CABO / METRES OF LINE | 3,23 | 0,68 | 3,91 |
MANGUERA / WATERSPOUT | 4,12 | 0,87 | 4,99 |
BUZO / DIVER | 156,70 | 32,91 | 189,61 |
REMOLQUE / TOWING | 62,68 | 13,16 | 75,84 |
MANO DE OBRA / LABOUR | 39,19 | 8,23 | 47,42 |
BUMPERS / FENDER | 172,37 | 36,20 | 208,57 |
El precio de estancia en varadero es aplicable por metro cuadrado y día.
Price for stay in boatyard is per day and m2 from the total occupation of the boat.
VARADERO / DRY DOCK | PRECIO – PRICE | IVA 21% | TOTAL – TOTALLY | |
---|---|---|---|---|
DEL 01/03 AL 30/09 | 0,46 | 0,10 | 0,56 | |
>30 DÍAS 40% | ||||
DEL 01/10 AL 28/02 | 0,46 | 0,10 | 0,56 | 0,34 |
El precio de la ECOTASA es aplicable por metro cuadrado y día e incluye suministros de agua, luz y residuos.
Price for the ECO fee is per day and m2 from the total occupation of the boat and includes water, electricity and waste.
ECOTASA | PRECIO / RATE | IVA / VAT 21% | TOTAL – TOTALLY |
---|---|---|---|
ECOTASA / ECOFEE | 0,10 | 0,02 | 0,12 |