Máximos: 60 ton – manga 5 m / Maximum: 60Ton – Beam 5m. El precio incluye una maniobra de izada o botadura / The rate includes one launch /lift off /onto cradle / transport.
ESLORA / LENGTH (LOA) | PRECIO / RATE | IVA / VAT 21% | TOTAL – TOTALLY |
---|---|---|---|
HASTA 10 M. / UP TO 10 M. | 79,06 | 16,60 | 95,66 |
DE 10 A 12 M. / 10 TO 12 M. | 132,69 | 27,86 | 160,55 |
DE 12 A 14 M. / 12 TO 14 M. | 153,10 | 32,15 | 185,25 |
DE 14 A 16 M. / 14 TO 16 M. | 204,13 | 42,87 | 247,00 |
DE 16 A 18 M. / 16 TO 18 M. | 246,96 | 51,86 | 298,82 |
DE 18 A 20 M. / 18 TO 20 M. | 299,01 | 62,79 | 361,80 |
DE > 20 / > 20 M. | 332,32 | 69,79 | 402,11 |
MAQUINA A PRESIÓN / HIGH-PRESSURE CLEANER | PRECIO / RATE | IVA / VAT 21% | TOTAL – TOTALLY |
---|---|---|---|
HASTA 12 M. / UP TO 12 M. | 59,27 | 12,45 | 71,72 |
DE 12 A 16 M. / 12 TO 16 M. | 69,15 | 14,52 | 83,67 |
DE > 16 M. / > 16 M. | 88,92 | 18,67 | 107,59 |
PLUMA / BOOM | PRECIO / RATE | IVA / VAT 21% | TOTAL – TOTALLY |
---|---|---|---|
1ª HORA / 1ST HOUR | 52,42 | 11,01 | 63,43 |
2ª HORA Y SIGUIENTES / 2ND AND NEXT | 26,21 | 5,50 | 31,71 |
Mínimo facturado : una hora.
Minimum invoiced: one hour.
OTROS SERVICIOS / OTHER SERVICES | PRECIO / RATE | IVA / VAT 21% | TOTAL – TOTALLY |
---|---|---|---|
CABO / METRES OF LINE | 3,14 | 0,66 | 3,80 |
MANGUERA / WATERSPOUT | 4,00 | 0,84 | 4,84 |
BUZO / DIVER | 151,99 | 31,92 | 183,91 |
REMOLQUE / TOWING | 60,80 | 12,77 | 73,57 |
MANO DE OBRA / LABOUR | 38,01 | 7,98 | 45,99 |
BUMPERS / FENDER | 167,19 | 35,11 | 202,30 |
El precio de estancia en varadero es aplicable por metro cuadrado y día.
Price for stay in boatyard is per day and m2 from the total occupation of the boat.
VARADERO / DRY DOCK | PRECIO – PRICE | IVA 21% | TOTAL – TOTALLY | |
---|---|---|---|---|
DEL 01/03 AL 30/09 | 0,45 | 0,09 | 0,54 | |
>30 DÍAS 40% | ||||
DEL 01/10 AL 28/02 | 0,45 | 0,09 | 0,54 | 0,32 |
El precio de la ECOTASA es aplicable por metro cuadrado y día e incluye suministros de agua, luz y residuos.
Price for the ECO fee is per day and m2 from the total occupation of the boat and includes water, electricity and waste.
ECOTASA | PRECIO / RATE | IVA / VAT 21% | TOTAL – TOTALLY |
---|---|---|---|
ECOTASA / ECOFEE | 0,05 | 0,01 | 0,06 |